Action Plan

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Action Plan

Due to the size and complexity of the new enlarged Coors Golden branch the sequence of track laying has been changed to the following:

  1. North Yard Locomotive facilities
  2. Cargill, Alpine and RG Motorway Industries
    • Scenery can now commence for modules 7 & 8 between Utah Jct. and the Moffatt Tunnel East Portal
  3. Commerce City Industries
  4. Denver Union Stockyards
    • Ballasting and applying of scenic material for the Denver yards & Denver stockyards together with finalising the wiring and the control panels can now commence
  5. Craig Branch
    • Scenery can now commence for module 11 between the West Portal and Craig
  6. Repair the Joint Line Return Loop & South Denver Module
    • Rewiring of the control panel will be required here
  7. Denver Union Station – C&S Trackage
  8. UP Industries & small yard
  9. Ford Motor & East Denver Belt Line Lead Tracks
    • Ballasting and applying of scenic material for the DUT, Rice yard & industries together with finalising the wiring and the control panels can now commence
  10. Coors Golden Branch

Finished laying the Main Line — at last!

Finally finished installing all 7 staging tracks (holding 14 18 car trains) at the Grand Jct. return loop which means that both the Rio Grande and CB&Q/UP main lines have been installed, leaving only the track for 9 branches and industry groupings to be laid.

Removed part of the scenery divider thereby making it possible to expand the Coors Brewery trackage by 150% whilst eliminating the Glenwood Springs Industrial area which was not prototype based.

Before:

After:

Coors Brewery now has 8 separate buildings:

  • Coors Brewery Main Building
  • Power Plant
  • Brewing & Transload Operations
  • Rocky Mountain Metal Container Factory
  • Coors Porcelain Company
  • Bottling Plant
  • Distribution Center
  • East Silos Elevator