D&RGW • C&S • CB&Q • UP • AT&SF • CRI&P + SP • MP • WP

Finished laying the Main Line — at last!

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Finished laying the Main Line — at last!

Finally finished installing all 7 staging tracks (holding 14 18 car trains) at the Grand Jct. return loop which means that both the Rio Grande and CB&Q/UP main lines have been installed, leaving only the track for 9 branches and industry groupings to be laid.

Removed part of the scenery divider thereby making it possible to expand the Coors Brewery trackage by 150% whilst eliminating the Glenwood Springs Industrial area which was not prototype based.

Before:

After:

Coors Brewery now has 8 separate buildings:

  • Coors Brewery Main Building
  • Power Plant
  • Brewing & Transload Operations
  • Rocky Mountain Metal Container Factory
  • Coors Porcelain Company
  • Bottling Plant
  • Distribution Center
  • East Silos Elevator

Leave a Reply

You must be logged in to post a comment.