Actioned since 10th May 2023:

  1. Extended BUS wiring to second PD4 (Gore Canyon) module and control panel.
  2. Laid cork roadbed to Edna Mine, etc on the Craig Line.
  3. Began to install PD4 feeder wires.
  4. Laid NO-OX grease on PD6 & PD7 loop trackage.
    • D&RGW F7ABA runs very well on this track
    • Cleaned with a Peco block rubber all of the problem spots on PD2 & PD5 trackage in preparation for laying NO-OX on this track
    • Note that all testing has been conducted at NCE speed notch 10 (16 scale mph)
  5. Relocated BD-20s and Accessory point motor controls on South Denver PD11 loop.

Immediate Action:

  1. Lay NO-OX on PD2 & PD5 track and test the loop.
  2. Lay CRC Di-electric grease on PD3 & PD4 trackage and test with ATSF locos to be used at the AMRA show during June holiday weekend.
  3. Investigate and maybe fix the “short” problem running lighted passenger cars on PD2.
  4. Continue installing feeder wires on PD4 (Gore Canyon) module and test.
  5. Lay Craig Branch trackage and wiring.

Ongoing Action:

  1. Fix or replace sticky point motors: P313;315;317;318.
  2. Design PD4 control panel diagrams with Visio and install switches and LEDs.
  3. Build PD3 & PD4 kits and install scenery.
  4. Rewire South Denver PD11 trackage and control panel.
  5. Finish building South Denver kits.
  6. Test run trains from South Denver to Grand Jct. and return.
  7. Lay all of the Grand Junction return loop tracks.
  8. Lay DUSTY tracks and build livestock kits.
  9. Build kits for the layout trackage laid.

Daily Progress & Error Blog

Actioned tonight:

  1. Finished fixing the BUS wiring for PD4 tracks T315-T317 inclusive.
  2. After cutting new gaps in the White side I Installed plastic insulators in the gaps.
  3. Filed down and tested ok.

Notes:

  1. Loco moves very hesitantly over the Winter Park tracks.
  2. Needs a more thorough clean.

Immediate Action:

  1. Finish the BUS wiring for PD4.
  2. Fix or replace sticky point motors: P313;315;317;318.
  3. Checkout the actions request to fix the South Denver PD.

Ongoing Action:

  1. Need to investigate stalling problems with Big Loop turnouts.
  2. Solve “short” problem running lighted passenger cars.
  3. Complete laying track from Bond to Craig and temporarily wire.
  4. Design PD4 control panel diagrams with Visio and install switches and LEDs.
  5. Lay all of the Grand Junction return loop tracks.

Daily Progress & Error Blog

Tonight’s Cockup:

  1. Wired T415;416;417 white side. Red already wired and attached to Red BUS.
  2. Wired the white wires of T416;417 to their BD-20s.
  3. Wondered why up to 3 LED lights on the BD-20s lighted up at the same time.
  4. After a while I realised that the gaps had been cut in the RED rails – but not in the white.

Solution:

  1. Cut gaps in the white rails as well.
  2. That should fix the problem and will be a lot easier than re-wiring the Red wires through the BD-20s.

Then carry on with the schedule . . .

Daily Progress & Error Blog

Actioned tonight:

  1. Finished installing all of the PD4a point motors:
    • P319;320;314;316;319;320 work ok.
    • P313;315;317;318 have issues and may need to be replaced.
  2. Started using new DCC Concepts soldering iron with temp control and auto turn off. Pretty good results so far.

Immediate Action:

  1. Finish the BUS wiring for PD4.
  2. Fix or replace sticky point motors: P313;315;317;318.

Ongoing Action:

  1. Need to investigate stalling problems with Big Loop turnouts.
  2. Solve “short” problem running lighted passenger cars.
  3. Complete laying track from Bond to Craig and temporarily wire.
  4. Design PD4 control panel diagrams with Visio and install switches and LEDs.
  5. Lay all of the Grand Junction return loop tracks.

Daily Progress & Error Blog

Actioned since 29 April 2023:

  1. Installed wiring from the Command Station to the two PD4 control panels.
  2. Installed the PD4 BUS from Winter Park to Grandby.
  3. Wired Turnouts P313, P314, P319 & P320.
  4. Stuck on P318 — point motor seems to be stuck.
  5. Tested the Big Loop from DUSTY (Denver Union Stock Yard) to Grand Jct loop. Runs ok sometimes. Locos seem to stall on a number of the turnouts when ran at low speeds. Speeds over NCE 20-30 do not stall. Significant problem.
  6. The “short” problem running with lighted passenger cars occurred when two locos passed each other on the Kato crossover section. They both stalled.

Immediate Action:

  1. Fix sticky P318 point motor.
  2. Need to finish wiring P315;316;317
  3. Need to finish the BUS wiring for PD4.
  4. Need to investigate stalling problems with Big Loop turnouts.
  5. Solve “short” problem running lighted passenger cars.

Ongoing Action:

  1. Complete laying track from Bond to Craig and temporarily wire.
  2. Design PD4 control panel diagrams with Visio and install switches and LEDs.
  3. Lay all of the Grand Junction return loop tracks.