D&RGW • C&S • CB&Q • UP • AT&SF • CRI&P + SP • MP • WP

Daily Progress & Error Blog

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Daily Progress & Error Blog

Actioned tonight:

  1. Finished fixing the BUS wiring for PD4 tracks T315-T317 inclusive.
  2. After cutting new gaps in the White side I Installed plastic insulators in the gaps.
  3. Filed down and tested ok.

Notes:

  1. Loco moves very hesitantly over the Winter Park tracks.
  2. Needs a more thorough clean.

Immediate Action:

  1. Finish the BUS wiring for PD4.
  2. Fix or replace sticky point motors: P313;315;317;318.
  3. Checkout the actions request to fix the South Denver PD.

Ongoing Action:

  1. Need to investigate stalling problems with Big Loop turnouts.
  2. Solve “short” problem running lighted passenger cars.
  3. Complete laying track from Bond to Craig and temporarily wire.
  4. Design PD4 control panel diagrams with Visio and install switches and LEDs.
  5. Lay all of the Grand Junction return loop tracks.

Leave a Reply

You must be logged in to post a comment.