Daily Progress & Error Blog

Actioned tonight:

  1. Installed wiring from the Command Station to the two PD4 control panels.
  2. Installed 40% of the PD4 BUS.

Immediate Action:

  1. Finish laying the PD4 BUS.
  2. Need to investigate stalling problems at P266 & P303 turnouts
  3. Solve “short” problem running lighted passenger cars.

Ongoing Action:

  1. Wire track feeders from Winter Park to Bond to the PD4 BUS.
  2. Wire PD4 turnouts to temporary connections on the control panels.
  3. When complete lay track from Bond to Craig and temporarily wire.
  4. Lay all of the Grand Junction return loop tracks.