Actioned tonight:

  1. Wired T503 & T504 with Loops to the BD20s. Tested ok.
  2. Replaced screw terminals for P264-P267 with a solder terminal strip. Easier to access.
  3. Wired 24vDC CDU to local control panel.
  4. Wired P264 – tested ok.

Outstanding Actions for current phase:

  1. Finish wiring turnouts P265-P267.
  2. Find fault of sticky track over P264 & P267.
  3. Reinstall turnouts P311 & P312.
  4. Test UP/CBQ loop for freight running and run test trains on both the UP and DRGW trackage ahead of NMRA meeting on Sunday.
  5. Buy Black Mat Paint and other supplies for the NMRA working bee on Sunday.

Leave a Reply