D&RGW • C&S • CB&Q • UP • AT&SF • CRI&P + SP • MP • WP

Daily Progress & Error Blog

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Daily Progress & Error Blog

Tonight’s Action: Working on Power District (PD) 3 being the RG main line from Denver to the Moffat Tunnel on Module 8+7

Wired all 6 of the block occupancy LEDs on control panel that are linked to the BD20s.

All worked except T407.

Battery in CAB 02 appears to have failed.

Going forward: The clear yellow LEDs display much better than at first thought. Clear yellow LEDs should be swapped for all of the normal yellow LEDs used for turnout direction in the control panel for Module 8+7.

Leave a Reply

You must be logged in to post a comment.