Daily Progress & Error Blog

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Daily Progress & Error Blog

Working on Power District (PD) 3 being the RG main line from Denver to the Moffat Tunnel on Module 8+7

  1. Track successfully installed for all of the track blocks T407-T412. All wired and trains run ok.
  2. NCE BD-20 track detectors installed for all 6 blocks. 3 loops of solid feeder wire used.
  3. After a lot of time waste due to the 9cDV polarity supply being incorrectly identified they all now correctly light on the board when the block is occupied.
  4. 2 blocks overnight lost power due to inadequate solder connections. Resolved and all ok now.

Previous completed work on PD3 on Module 8+7

  1. Control Panel constructed, plan drawn and all turnout DPDT switches and LED lights installed.
  2. Preference would have been for SPST momentary contact switches + Gaugemaster GM500 latching relays. However GM500s failed to work after many attempts and different relays. Gave up and reverted to DPDT switches + push buttons for power from the CDU.
  3. All DPDT turnout switches now installed and all working ok except P305.
  4. Track cleaned on Tuesday 04/04/2023 with ACT-6006. Appeared to immediately work ok – no stalling. However locos often need a big 5 nudge to initially start.

Next Action on PD3 on Module 8+7

  1. Install block occupancy LEDs on control panel – linked to the BD20s.
  2. Extend wiring to blocks before and after T407-T412 for testing.
  3. More through loco testing including real trains with consists.
  4. Repeat PD3 action on PD5 (Booster #3) UP/CBQ main line.
  5. Test thoroughly and then start to add scenery.