Finally finished installing all 7 staging tracks (holding 14 18 car trains) at the Grand Jct. return loop which means that both the Rio Grande and CB&Q/UP main lines have been installed, leaving only the track for 9 branches and industry groupings to be laid.

Removed part of the scenery divider thereby making it possible to expand the Coors Brewery trackage by 150% whilst eliminating the Glenwood Springs Industrial area which was not prototype based.
Before:

After:

Coors Brewery now has 8 separate buildings: