D&RGW • C&S • CB&Q • UP • AT&SF • CRI&P + SP • MP • WP

Phase V Benchwork Completed

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Phase V Benchwork Completed

All of the benchwork for Phase V is now complete. Below is Gorge Canyon, (between Kremmling and Bond) where the foam scenery supports will be installed ahead of the trackwork, so as to minimise the mess that will be created during construction of the 200-300 (15″ to 22½”) foot mountain side above the Canyon. The actual canyon walls were 1000 feet high. That is 75″ in N Scale which while doable would be out of proportion with the rest of the layout. The Colorado river will be modelled on the lower part of the benchwork.

Below is the baseboard for the town of Craig in Colorado. The Craig branch from Bond is still an active coal branch on the Denver & Rio Grande Western.

Below is the foam base for the Aspen branch line from Glenwood Springs. This branch line was built by the Denver & Rio Grande Western in order to tap silver mines in the area around Aspen and was completed in 1887. The line saw significant business in its first few years, but as the silver boom tapered off, traffic along the line declined. Ultimately, the portion of the line south from Woody Creek to its end at Aspen was abandoned in 1968 and the rest of the line in 1995. As Denver’s Railroads is set in the period 1947-1963 for Passenger traffic and 1968-1969 for freight traffic the Aspen branch was still an active railroad, with passengers, coal, cattle, sheep, poultry, petroleum, perishables and explosives (dynamite) being the main commodities carried.

Leave a Reply