Rod and John came over on Saturday and we got a lot done. Rod is half way through laying the cork for phase 3 and John got a fair way through wiring the BUS on module 7 of phase 2.
I finished laying the cork for the connection from phases 1 & 2 to the Moffat Tunnel in phase 5. This means that I can now lay the track which connects phases 1 & 2.
Once that is done – and the BUS wiring for modules 6 & 7 is complete – we will be able to run LONG trains all the way from the Grand Junction return loop to the wye/loop at Denver yard.