C&S Leadville Branch line with the track all laid. The wiring is also complete. Just needs the testing of the BUS and a new control panel diagram for the toggle switches to control the Kato turnouts.
At last they have laid the earthworks as a start to the house to accompany the Denver’s RailRoads layout (see shed at back of block). I need the house so that I can get all of the boxes and junk (aka furniture) out of the railway room and I can start to rebuild the layout.