Rock Island Sandown Layout — October Update

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Rock Island Sandown Layout — October Update

Photos of progress made during September and October 2026.

12 September 2026: All of the turnouts have been wired (center) together with the main 8 power districts (left side) and connected to their appropriate terminal block.


16 September 2026: NCE Auto Reverser added to control the return loop trackage in Airwin Town.


6 October 2026: Control Panel constructed and installed. Track plan drawn in Microsoft Visio, printed onto two A3 sheets, laminated and then glued in place.

7 October 2026: Began to install 2 Megapoints Controllers WiFi “Control” boards and 4 boards to control the Kato turnouts. More info to follow in November/December but in the meantime check out their web site at https://megapointscontrollers.co.uk/system2/


16 October 2026: All of the Megapoints Controllers boards wired up and ready to go . . . but no go as not all of the boards can see my WiFi router


25 October 2026: Development has ground to a halt while I wait for a USB Dongle to come from Megapoints Controllers which will enable all of the boards to work together with no reliance on WiFi. Due 17 November 2026. Will believe it when I see it.


If the Megapoints Controllers System2 boards work out as advertised I plan to make a YouTube Video of the installation.

Watch this space . . .