The Track Plan is Updated

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

The Track Plan is Updated

For 6 months or more I have been working on updating the Denver’s RailRoads track plan. Initially I wanted to improve the Denver rail yards and to provide UP and CBQ with their own yard (be it that they had to share) separate from Rio Grande’s North Yard. I then decided that I had too much yard and not enough scenic hills and mountains. To rectify this issue I decided to move the East Denver Belt Line and replace it with Rio Grande’s Big 10 Curve and Pinecliff station. This will give me a large open area of mainly just scenery, which the layout plan was lacking.

In order to re-establish the East Denver Belt Line industries I (a) deleted the Cherokee power station from East Denver and replaced it with the, now discontinued, Arapahoe power station in South Denver, (b) kept the Koppers crossties and utility poles operation in the corner of module 7 and (c) abandoned the Globe Smelter. All of the other industries, including Denver Union Stockyards and the Conoco Refinery, will fit between the new Rio Grande and UP/Burlington yards. In real life they are in that location but not so compressed!

I also improved the entrance and exit to the Salt Lake City return loop and staging tracks and their relationship with Glenwood Springs and its industries (which really exist but unfortunately are not railroad served). On the Craig branch I also swapped out the Springboat Springs station stop for Phippsburg and added the Edna mine which was the prototype for Walthers New River Mining Co kit, which I plan to use.

Denver’s RailRoads Track Plan #138. A high-res pdf copy can be viewed at https://denversrailroads.com/Denver/DR-Layout/DR138A3.pdf.

Kato to the rescue

I finally got fed up trying to run trains at low speeds over the Peco scissors turnout and decided to replace it with a Kato unit. During the dismantling of the Peco unit I found one of the wires to one of the Dual Frog Juicers was broken. This was almost certainly the reason why Locos would not cross the Peco scissors at slow speeds without stalling. However I decided to continue with the swap as I saved 4 point motors and 2 dual frog juicers for future use. The Kato unit is a single point motor which throws the rails to either straight through, or crossed. How simple!

An Atlas GP9 crossing the Kato scissors crossing with no issues at all!

I did a few more jobs before Perth’s 40 degree plus Christmas drove me indoors! . . .

Installed an NCE Mini Panel in preparation for wiring up the South Denver control panel.
In order to wire up the Mini Panel I had to take the wiring across the roof of the garage. At the recommendation of the NCE groups.io group I took the opportunity to reinstall the RB02 wireless repeater in the roof. I also learnt how to make NCE 6p6c cables.
I reinforced the support for the three Denver Union Station modules at the suggestion of Frank, our WA NMRA Superintendent.
Installed the first of a number of human lounging stations, with arm rest (from Kogan), fold up drink holder (from Boat Accessories Australia) and NCE throttle holder
At the suggestion of the local NMRA guys I have started the biggish job of concreting the gap between the garage walls and the outside world to try and minimise the dust issues caused by Perth’s sandy soil.