{"id":822,"date":"2024-01-14T17:22:58","date_gmt":"2024-01-14T07:22:58","guid":{"rendered":"https:\/\/denversrailroads.com\/blog\/?p=822"},"modified":"2024-01-14T17:22:58","modified_gmt":"2024-01-14T07:22:58","slug":"action-plan","status":"publish","type":"post","link":"https:\/\/denversrailroads.com\/blog\/2024\/01\/14\/action-plan\/","title":{"rendered":"Action Plan"},"content":{"rendered":"\n<p><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-luminous-vivid-orange-color\">Due to the size and complexity of the new enlarged Coors Golden branch the sequence of track laying has been changed to the following:<\/mark><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\"><strong>North Yard Locomotive facilities<\/strong><\/mark><\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\"><strong>Cargill, Alpine and RG Motorway Industries<\/strong><\/mark>\n<ul class=\"wp-block-list\">\n<li>Scenery can now commence for modules 7 &amp; 8 between Utah Jct. and the Moffatt Tunnel East Portal<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\"><strong>Commerce City Industries<\/strong><\/mark><\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Denver Union Stockyards<\/mark><\/strong>\n<ul class=\"wp-block-list\">\n<li>Ballasting and applying of scenic material for the Denver yards &amp; Denver stockyards together with finalising the wiring and the control panels can now commence<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Craig Branch<\/mark><\/strong>\n<ul class=\"wp-block-list\">\n<li>Scenery can now commence for module 11 between the West Portal and Craig <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Repair the Joint Line Return Loop &amp; South Denver Module<\/mark><\/strong>\n<ul class=\"wp-block-list\">\n<li>Rewiring of the control panel will be required here<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Denver Union Station \u2013 C&amp;S Trackage<\/mark><\/strong><\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">UP Industries &amp; small yard<\/mark><\/strong><\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Ford Motor &amp; East Denver Belt Line Lead Tracks<\/mark><\/strong>\n<ul class=\"wp-block-list\">\n<li>Ballasting and applying of scenic material for the DUT, Rice yard &amp; industries together with finalising the wiring and the control panels can now commence<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-green-cyan-color\">Coors Golden Branch<\/mark><\/strong><\/li>\n<\/ol>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to the size and complexity of the new enlarged Coors Golden branch the sequence of track laying has been changed to the following:<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-822","post","type-post","status-publish","format-standard","hentry","category-n-scale"],"_links":{"self":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/comments?post=822"}],"version-history":[{"count":1,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/822\/revisions"}],"predecessor-version":[{"id":823,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/822\/revisions\/823"}],"wp:attachment":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/media?parent=822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/categories?post=822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/tags?post=822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}