{"id":774,"date":"2023-06-27T02:15:23","date_gmt":"2023-06-26T16:15:23","guid":{"rendered":"https:\/\/denversrailroads.com\/blog\/?p=774"},"modified":"2023-06-27T02:16:08","modified_gmt":"2023-06-26T16:16:08","slug":"ongoing-progress-2","status":"publish","type":"post","link":"https:\/\/denversrailroads.com\/blog\/2023\/06\/27\/ongoing-progress-2\/","title":{"rendered":"Ongoing Progress"},"content":{"rendered":"\n<p><strong>Action since June 22, 2023:<\/strong> <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Glued down 20+ rubber panels on floor of layout room<\/li>\n\n\n\n<li>Test run Loco over PD4 &amp; PD2 &#8211; electrical black spots problems identified<\/li>\n<\/ol>\n\n\n\n<p><strong>Immediate Action:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Connect feeder wires for T428 &amp; T429 to PD4 track and control panel<\/li>\n\n\n\n<li>Cut gaps in PD4\u00a0<strong>white\u00a0<\/strong>track as they currently light up for multiple blocks<\/li>\n\n\n\n<li>Fix electrical black spots on PD4 track<\/li>\n\n\n\n<li>Test run a train over PD3 &amp; PD4, returning to North Yard over PD2 &amp; PD5 track.<\/li>\n\n\n\n<li>Continue gluing rubber panels on floor of layout room<\/li>\n<\/ol>\n\n\n\n<p><strong>Big Picture Tasks for Action \u2014 once the immediate tasks have been actioned:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Install the Kato double crossover and industry tracks on the DUSTY small loop and then . . .\n<ul class=\"wp-block-list\">\n<li>Build the DUSTY kits \u2014 its time for a change \u2014 and finish the South Denver kits.<\/li>\n\n\n\n<li>Install all PD7 tackage and activate the control panel.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Install the 7 loop tracks at Grand Jct . . .\n<ul class=\"wp-block-list\">\n<li>Install BD-20s connecting to the UP\/CBQ main line and the 7 staging tracks.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Lay Craig Branch trackage and wiring and then . . .\n<ul class=\"wp-block-list\">\n<li>Build the Craig Branch kits<\/li>\n\n\n\n<li>Activate the&nbsp;<strong>two&nbsp;<\/strong>PD4 control panels.<\/li>\n\n\n\n<li>Build the Flatirons scenery on the PD5 module.<\/li>\n\n\n\n<li>Build the Winter Park\/Moffat Tunnel scenery on the PD4 module.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Lay the North Yard and CBQ Yard trackage.<\/li>\n\n\n\n<li><strong><em>Enable an Operating FREIGHT Layout between Denver North Yard and Grand Junction Loop &amp; Staging Tracks.<\/em><\/strong><\/li>\n<\/ol>\n\n\n\n<p><strong>Next Phase: Activate DUT, South Denver, Joint Line Loop &amp; Staging Tracks<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Build the Layout Framework for the enlarged Joint Line Loop &amp; Staging Tracks. <\/li>\n\n\n\n<li>Relay enlarged Joint Line Loop &amp; Staging Tracks.<\/li>\n\n\n\n<li>Lay additional trackage for DUT area.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Action since June 22, 2023: Immediate Action: Big Picture Tasks for Action \u2014 once the immediate tasks have been actioned: Next Phase: Activate DUT, South Denver, Joint Line Loop &amp; Staging Tracks<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-774","post","type-post","status-publish","format-standard","hentry","category-n-scale"],"_links":{"self":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/comments?post=774"}],"version-history":[{"count":2,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/774\/revisions"}],"predecessor-version":[{"id":776,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/774\/revisions\/776"}],"wp:attachment":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/media?parent=774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/categories?post=774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/tags?post=774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}