{"id":506,"date":"2021-05-19T15:14:22","date_gmt":"2021-05-19T05:14:22","guid":{"rendered":"http:\/\/denversrailroads.com\/blog\/?p=506"},"modified":"2021-05-19T15:30:16","modified_gmt":"2021-05-19T05:30:16","slug":"putting-the-layout-back-together-update-3","status":"publish","type":"post","link":"https:\/\/denversrailroads.com\/blog\/2021\/05\/19\/putting-the-layout-back-together-update-3\/","title":{"rendered":"Putting the layout back together \u2014 Update #3"},"content":{"rendered":"<p>Modules 1 &amp; 1a bolted together and<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-507\" src=\"https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0087-300x225.jpeg\" alt=\"\" width=\"601\" height=\"451\" srcset=\"https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0087-300x225.jpeg 300w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0087-768x576.jpeg 768w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0087-1024x768.jpeg 1024w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0087.jpeg 2048w\" sizes=\"auto, (max-width: 601px) 100vw, 601px\" \/><\/p>\n<p>level with modules 2, 3 &amp; 4.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-508\" src=\"https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0090-300x225.jpeg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0090-300x225.jpeg 300w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0090-768x576.jpeg 768w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0090-1024x768.jpeg 1024w, https:\/\/denversrailroads.com\/blog\/wp-content\/uploads\/2021\/05\/IMG_0090.jpeg 2048w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Connecting the L girder framework for modules 5 &amp; 6 to module 4 is next on the list followed by the framing and the connection to module 7.<\/p>\n<p>For an understanding of which module is which <a href=\"https:\/\/denversrailroads.com\/Denver\/DR-Layout\/DR127A3.pdf\">click here to view the trackplan<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Modules 1 &amp; 1a bolted together and level with modules 2, 3 &amp; 4. Connecting the L girder framework for modules 5 &amp; 6 to module 4 is next on the list followed by the framing and the connection to module 7. For an understanding of which module is which click here to view the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-506","post","type-post","status-publish","format-standard","hentry","category-n-scale"],"_links":{"self":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/comments?post=506"}],"version-history":[{"count":3,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/506\/revisions"}],"predecessor-version":[{"id":511,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/posts\/506\/revisions\/511"}],"wp:attachment":[{"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/media?parent=506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/categories?post=506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/denversrailroads.com\/blog\/wp-json\/wp\/v2\/tags?post=506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}