The benchwork for Phase II consists of eight individual modules, each approximately 6' (1830mm) long. They have been designed to be disconnected from the main layout and if necessary moved as individual modules to a new location.
This benchwork is complete and has been painted a mud Brown colour. The modules lay on top of an independent "L Girder" framework, with adjustable legs.
Each module will be protected by its own NCE circuit breaker and will be numbered as Power Districts 4 to 11. Power Districts 1 to 3 are fixed modules comprising of the Return Loops (PD1), Main Line (PD2), Golden Branch (PD2a), Golden Loop (PD2b), Ralston Branch (PD2c) and the Glenwood Springs and Duckunder connection (PD3).
The following are the parts to this phase:
© Copyright 2012-2022. Dennis N Turner. All Rights Reserved.