D&RGW • C&S • CB&Q • UP • AT&SF • CRI&P + SP • MP • WP

Phase 1 and Phase 2 of Denver' RailRoads is almost connected!

Recording the progress of building the Denver’s RailRoads N Scale layout

All genuine posts are welcomed and will be acknowledged. Please submit your first post by email to: dennis@denversrailroads.com

Phase 1 and Phase 2 of Denver’ RailRoads is almost connected!

Rod and John came over on Saturday and we got a lot done. Rod is half way through laying the cork for phase 3 and John got a fair way through wiring the BUS on module 7 of phase 2.

I finished laying the cork for the connection from phases 1 & 2 to the Moffat Tunnel in phase 5. This means that I can now lay the track which connects phases 1 & 2.

Once that is done – and the BUS wiring for modules 6 & 7 is complete – we will be able to run LONG trains all the way from the Grand Junction return loop to the wye/loop at Denver yard.

Leave a Reply

You must be logged in to post a comment.